Manning River Entrance
What Swash did Swash provided innovative design and advisory services for strategic assessment of sand management and dredging options at Manning River Entrance. About the project The entrance to the Manning River includes two openings, one at Harrington to the north and one to the south, the Farquhar entrance at Old Bar. The Manning River […]
NSW long-term dredging program business case
What Swash did Swash provided specialist dredging and procurement advice and insights into the preparation of a structured, holistic dredging program for NSW regional ports, which includes 25 regional coastal harbours and 21 trained river entrances. About the project Specialist dredging and procurement advice and insights into preparation of a structured, holistic dredging program for […]
Nerang River dredging investigation
What Swash did Swash undertook a comprehensive desktop investigation to determine the need for sediment removal through dredging or bed-levelling. Swash provided a final report and presentation material for Gold Coast Waters Authority (GCWA) board and management. The aims of this investigation were to: Determine the extent of shoaling with respect to current target navigable […]
Barmah Choke sand management
What Swash did Swash is providing sand management and dredging advisory services for removal of sand deposits as a consequence of historical activities. Swash services include project management of supporting feasibility investigations and studies. About the project The Barmah Choke is a narrow section of the Murray River that runs through the Barmah–Millewa Forest. The […]
Hay Point dredging
What Swash did Swash personnel led the project management of numerous sustainable sediment management assessment studies, environmental risk assessment and development of dredging management and monitoring plans. This led to North Queensland Bulk Ports (NQBP) successfully attaining a Marine Park Permit and Sea Dumping Permit from the Great Barrier Reef Marine Park Authority to relocate […]